|
hPresentations given Tuesday, September 25, 2007
- 5A Bridge Constructability
- Innovative Concrete Solution Prevails Over Long Steel Spans
Daniel Shiosaka, P.E., S.E., and N. Dillon Beck, Stanley Consultants, Inc., Phoenix, AZ
- Designing for Construction - The South 228th Street Bridge
Robert Fernandes, P.E., S.E., and Charles Spry, P.E., S.E., BERGER/ABAM Engineers, Inc., Seattle, WA
- Innovative PC/PS Bridge Construction Enables "Total Environmental Avoidance"
Thomas Barnard, DMJM Harris, Sacramento, CA
- 5B Bridge Inspection and Repairs
- Steel Girder Repair by Flame Straightening
Navaphan Viboolmate, P.E., Arizona Department of Transportation, Phoenix, AZ
- Fracture Critical and Fatigue Prone Inspection of the West Fremont Bridge Approach Structures
Mark A. Libby, P.E., HDR Engineering, Inc., Portland, OR
- Oregon DOT's Bridge Structural Health Monitoring Program Cases Studies
Steve Lovejoy, Ph.D., P.E., Oregon Department of Transportation, Salem, OR
- 5C Bridge Decks
- Design and Construction of a Reinforcement-Free Concrete Bridge Deck on Precast Girders
Mike Oliva, Ph.D., University of Wisconsin, Civil and Environmental Engineering, Madison, WI
- The Link Slab - Solution to Widening the I-5 Bridge in Everett, WA
Warren Wilson, P.E., S.E., and Jeff McGuire, P.E., BERGER/ABAM Engineers, Inc., Seattle, WA
- Bridge Deck Replacement Under Traffic-Induced Vibrations
Craig Shike, P.E., Oregon Department of Transportation, Salem, OR
- 6A Precast-Prestressed Concrete Bridges #2
- Design and Construction of Curved Precast Concrete Bridge Projects in Colorado
Gregg Reese, P.E., C.E., Summit Engineering Group, Littleton, CO
- New Developments in Concrete Bridges in Washington State
Bijan Khaleghi and James Cook, Washington State Department of Transportation, Bridge Structures Office, Tumwater, WA
- Build It and They Will Come - Oregon's Bulb Tee 90 Gaining Popularity
Jordan Pelphrey, E.I.T., and Keith Kaufman, Ph.D., Knife River, Harrisburg, OR
- 6B Asset Management
- Ancillary Structure Inspection Procedures and Findings
Michael J. Garlich, P.E., S.E., Collins Engineers, Inc., Chicago, IL
- Load Rating of Prestressed Concrete Girder Bridges - Interior vs. Exterior Girders
Brandy J. Rogers, M.S.C.E., Parametrix, Sumner, WA
David V. Jauregui, Ph.D., New Mexico State University, Las Cruces, NM
- Klineline Bridge Scour Monitoring
Carolyn Heniges, Clark County Department of Public Works, Vancouver, WA
Douglas Sarkkinen, P.E., S.E., Kramer Gehlen and Associates, Inc., Vancouver, WA
- 6C Idaho Bridges
- Rainbow Bridge Restoration
John Hinman, P.E., S.E., CH2M HILL, Inc., Boise, ID
- Kings Corner Railroad Crossing
James D. Porter, P.E., J-U-B Engineers, Boise, ID
- Lake Creek Bridges Design and Construction
Chris Boyd, P.E., McMillen Engineering, Coeur d'Alene, ID
Lisa Vernon, P.E., HDR, Boise, ID
- 7A Case Studies
- Integral Abutment Bridges
David Liu, Ph.D., P.E., S.E., and Steve Maltby, P.E., Parametrix, Portland, OR
Kenneth F. Dunker, P.E., Iowa Department of Transportation, Ames, IA.
- Integral Post-Tensioned Pier Cap - A Solution to Skew and Clearance Problems
Luong (Lou) H. Tran, P.E., Washington State Department of Transportation, Bridge and Structures Office, Tumwater, WA
- Durability of Concrete Bridges
Vijay Chandra, PB Americas, Inc, Herndon, VA
- 7B Retaining Walls and Substructures
- Innovative Retaining Wall System for the Dallas High Five Project
William J. Neely, Ph.D., P.E., The Reinforced Earth Company, San Diego, CA
- Construction of Structural Shoring and Retaining Walls
Jesse Beaver, P.E., Washington State Department of Transportation, Olympia, WA
- The Observational Method and Drilled Shaft Acceptance Criteria
Conrad W. Felice, LACHEL FELICE and Associates, Kirkland, WA
- 7C Steel Bridges #1
- 8A Emergency Replacements and Repairs
- Emergency Russian River Bridge Replacement at Geyserville, California (California Highway 128)
James Cook, P.E., and Brian Beaudoin, P.E., California Department of Transportation, Santa Rosa, CA
Robert Valentine, P.E., Nutt, Redfield and Valentine, Orangevale, CA
- King County Emergency Bridge Floor Damage Repairs
Jim Marcus, P.E., King County Department of Transportation, Seattle, WA
Ken Wilson, M.S.C.E., P.E., S.E., Integrity Structural Engineering, Seattle, WA
- Bill Williams River Bridge Fire Damage Assessment and Repair
Martha Davis, P.E, and Paul Tremel, P.E., HDR Engineering, Inc., Tucson, AZ
- 8B Long Span Bridges
- NW Maple Avenue Bridge Aesthetics, Economy and Constructability in a Modern Cast-in-Place Arch Bridge
Jim Bollman, P.E., OBEC Consulting Engineers, Eugene, OR
- Incremental Launching of Bridges in Europe
Marco Rosignoli, HNTB Corporation, Bellevue, WA
- Lightweight Concrete Long Span Bridges
Jiri "George" Gruygar, TRI, Salt Lake City, UT
- 8C Steel Bridges #2
- Prefabricated Connections for Accelerated Construction
Mike Culmo, CME Associates, Inc., East Hartford, CT
- The Designer Listens - The Perfect Continuous Girder Design
Don White, Professor, Georgia Institute of Technology, Civil and Environmental Engineering, Atlanta, GA
- Think Like a Contractor
John Yadlosky, P.E., HDR Engineering, Inc., Omaha, NE
|