|
Presentations given Monday, September 24, 2007
- 2A Accelerated Bridge Construction
- A Survey of Rapidly Constructed Bridges Using Prefabrication Systems
John S. Dick, Precast-Prestressed Concrete Institute, Chicago, IL
- Hood Canal Bridge East and West Approach Span Replacement
Joseph Merth, PE, Washington State Department of Transportation, Olympia, WA
- Precast-Prestressed Concrete Pavement for Rapid Bridge Approach Slab Reconstruction
Michael D. LaViolette, PE, HNTB Corporation, Omaha, NE
David K Merritt, PE, Transtec Group, Inc, Austin, TX
- 2B Bridge Service Live
- How Long Will your Bridge Last? The Need to Predict Service Life of Bridge Components
Mike Bartholomew, P.E. CH2M Hill, Inc, Corvallis, OR
- Design and Construction Practices That Can Result in Improved Service Life of Concrete Structure to 150 Years or More
Mohammad Sheikhizadeh, PE, Washington State Department of Transportation, Olympia, WA
- Service Life of Bridge Deck Repairs in Alberta
Paul D. Center, PE, FACI, CH2M Hill, Inc, Edmonton, AB, Canada
- 3A Precast-Prestressed Concrete Bridges #1
- Design of Precast-Prestressed Concrete Girders for Optimized Fabrication
Ricahrd Brice, PE and Bijan Khaleghi, PE, SE, Washington State Department of Transportation, Olympia, WA
- Decked Bulb-T Girder Bridges
Charles Spry, PE, SE, Berger/ABAM Engineers, Inc, Tacoma, WA
- Improving Predictions for Camber in Precast-Prestressed Concrete Bridge Girders
Michael Rosa, Washington State Department of Transportation, Olympia, WA
- 3B Pedestrian Bridges
- Suspension Trail Bridge Using Sustainable Design
Brad Miller, PE and Dustin Hirose, HDR Engineering Inc, Missoula, MT
- Interurban Trail Pedestrain Bridges
Mark Johnson, PE, CH2M Hill, Bellevue, WA
- Design and Construction of OMSI-Springwater Trail McLoughlin Boulevard Bridge
Gary Royer, PE, SE, OBEC Consulting Engineers, Eugene, OR
Dr. Jiri Strasky, PE, Consulting Engineer, Greenbrae, CA & Brno, Czech Republic
- 4A Bridge Aesthetics
- Aethetic Modifications to Precast Bridge Girders
Keith Kaufman, Ph.D., PE, Knife River, Harrisburg, OR
- Bridge Architecture of the 21st Century West Coast Bridge - An Architect's Perspective - Part 1
Paul Kinderman, PE, AIA, Washington State Department of Transportation, Olympia, WA
- Bridge Architecture of the 21st Century West Coast Bridge - An Architect's Perspective - Part 2
Michael Fitzpatrick, AIA, TY Lin International, San Francisco, CA
- Art in the Desert
Tina Sisley, PE, Arizona Department of Transportation, Phoenix, AZ
- 4B Bridge Software Benefits
- Getting to LRFD by Realizing the Benefits of Multistate Collaborative Software Development
Richard Brice, PE, Washington State Department of Transportation, Olympia, WA
Richard Pickings, PE, BridgeSight Software, Rescue, CA
- FHWA Tools (Software) to Reduce Bridge Deck Cracking
Tony Kojundic, FACI, Silica Fume Association, Pittsburgh, PA
- The Use of 3D Integraed Drawings on the Design of the New Folsom Bridge
Alex Harrison, MS, PE, and Ed Maechle, CH2M Hill, Inc, Sacramento, CA
|